Curious Machines

Underground engineering

The tunnel factory.

The cutterhead gets all the attention. Look behind it. What does a machine this big push against?

Model view
Rendered three-dimensional cutaway of the Tunnel-boring machine
Loading model
0%
A closer look

They built it twice.

Crews assembled and tested the first Crossrail machine in Germany, took it apart for shipment and assembled it again in west London. Open the exploded view to see how much machinery fits behind the face. At the end of the drive, Phyllis’s front steel shell stayed underground at Farringdon with a time capsule.

Model notes and sources

    Open another machine